By clicking “Accept All Cookies”, you agree to the storing of cookies on your device to enhance site navigation, analyze site usage, and assist in our marketing efforts. View our Privacy Policy for more information.
Landmark Roofing expertly overlaid the pre-existing roof system, preparing the substrate according to the manufacturer’s specifications. The team installed new fanfold insulation, tapered sections, and crickets for improved drainage, along with drain flashings with grates and Duro-Last two-way vents. Pre-fabricated flashings, new parapet wall vents, and a clean termination were also installed. Finishing the project with durable Duro-Tuff 50mil membrane in the selected color, they provided a 20-year NDL warranty for labor and materials, ensuring a long-lasting solution.