Commercial
Benton Central High School
Landmark Roofing recently executed this comprehensive roofing project utilizing the high-quality Duro-Last system. This involved removing the existing membrane, preparing the substrate, and installing ISO insulation with a durable Duro-Tuff 60mil membrane. Key features, such as 2-way vents, vinyl-coated drip edges, and a Duro-Last snow rail system, were carefully integrated for enhanced longevity and performance. Engineered and inspected by Duro-Last professionals, this project not only meets industry standards but includes a 20-year NDL warranty covering labor and materials, offering exceptional long-term value for our clients.
Duro-Last
Product
Duro-Tuff® - 60 mil
square feet
100,000
Our Work